Contact Us

Advertising

Comics

Crossword

The Arizona Daily Wildcat Online

Catcalls

Policebeat

Search

Archives

News Sports Opinions Arts Classifieds

Tuesday October 17, 2000

Football site
Football site
UA Survivor
Agulara

 

Police Beat
Catcalls

 

Alum site

AZ Student Media

KAMP Radio & TV

 


Tucson, state negotiating cost for landfill repair

Headline Photo

UA could have liability if site contains hazardous materials

As the auction date for the Tumamoc Hill approaches, the state and Tucson are trying to negotiate the repair cost for the landfill that contains UA waste.

There are estimated to be 365,000 tons of waste at the site, which could contain hazardous substances.

The cost of repair, which will most likely include a sealant being placed over the landfill, may be shared by Tucson and the state, James Keene, Tucson city manager, said.

But future examination of the site could raise the costs, which already exceed $1 million.

[Read More]